Incinerator Mechanical Installation for T·PARK Project

Incinerator Mechanical Installation for T·PARK Project
T· PARK is the first self-sustained sludge treatment facility in Hong Kong. It reflects Hong Kong’s vision to embrace the concept of “waste-to-energy” and to transform people’s attitudes towards resources recovery and recycling.
Kum Shing was the main contractor for two sludge incinerators installation, as well as installation of the inter-connecting piping within T· PARK in over 20km length, and supported to test and commissioning works.
2010
Castle Peak Power Station Coal Mill Maintenance and Repair Contract
Winning the first contract of CLP Power that applied the NEC model in Hong Kong, Kum Shing was responsible for the maintenance works of coal mill units at Castle Peak Power Station as well as the systems surrounding the power station, in meeting the needs of the use of green coal.
2014
Castle Peak Power Station Boiler Maintenance and Repair Contract
Kum Shing was responsible for the maintenance and repair works for heavy mechanical equipment, including the coal-fired boilers at Castle Peak Power Station and waste heat steam boilers at Black Point Power Station. Unnecessary deterioration of the boiler can then be reduced, and thereby maintain a high level of power generation efficiency.