Upgrade Of West Kowloon-Tsuen Wan Sewage System

Client
Drainage Services Department
Capability
Project Management, Civil & Building, Operation & Maintenance, Water Treatment
Status
Ongoing

Kum Shing assisted the Drainage Services Department on replacing aging sewers in Tsuen Wan, Kowloon City, Kwai Chung, Sham Shui Po, and Cheung Sha Wan. Our Civil & Building Tram is responsible for replacing and upgrading 14 kilometers of gravity sewers, rehabilitating six existing sewer crossings within stormwater box culverts and constructing two new dry weather flow interceptors and ancillary works. All the works will be carried out in the densely populated districts of Tsuen Wan, Kwai Chung, Sham Shui Po and Kowloon Tong. To handle this, strong brownfield experience and stakeholder management in the community are crucial.

Unlike a typical construction project involving simple demolition of a structure followed by building on the cleared plot, congested and sometimes uncharted underground utilities add to the difficulties in public engineering works. A further complication is that the gravity sewer system must descend continuously and smoothly. No bends in the sewer pipe are allowed in either the vertical profile or horizontal alignment. This brownfield project also requires that the operation of the running sewer be maintained during throughout the works period. Temporary diversion works must be set before the sewer system upgrade commences.

Kum Shing Civil & Building Team packs a formidable technological arsenal. By adopting detailed planning and expectation management, the team can ensure that engineering works to be carried out on the busy streets were clearly understood by all stakeholders. With the use of various trenchless construction technology, such as tunnel boring machine (TBM) and coring, impacts on traffic and the public can be significantly minimised. The team had also adopted a formidable technological arsenal, including 3D laser scanner, Building Information Modelling (BIM) and an electronic document management system, with capabilities in reserve to meet any issue. Employed CCTV, AI and mobile surveillance camera to assist monitoring site and confined space work and multiple work fronts.

We use cookies to enhance your browsing experience and provide personalized content. By clicking "Accept Cookies", you consent to the use of cookies on this website. For more information on how we use cookies, please refer to our Cookie Policy.