Installation of Power System for MEGA Plus Data Centre Substation

Location
Hong Kong
Client
iAdvantage
Capability
Project Management, Electrical & Mechanical, Control System, Power Transmission & Distribution
Completed In
2017
Status
Completed

Kum Shing Electrical & Engineering Team was responsible for the power system installation of the MEGA Plus data center in Tseung Kwan O. The scope of work included installation and testing & commissioning of CLP integrated protection and control system, substation design and implementation, installation of Gas Transformer (GIT), cable network and Ring Man Unit (RMU) connecting adjacent data centers in the TKO area, as well as testing & commissioning for energization of 132kV and 11kV equipment.